GRUWI-IT.DE ≡ Pendants Brakes, Hubs & Suspension New Arrivals Top Rail Support
  • Cable Railing Fittings | Metal Post

  • FineLine™ Drill & Tap Assembly – For 3/16″ Cable

FineLine™ Drill & Tap Assembly – For 3/16″ Cable

$16.62 $27.42
Description The FineLine™ DRILL & TAP ASSEMBLY is a compact, architectural assembly that represents the best in engineered cable rail systems for your metal posts. Drill and tap directly into steel posts (Min.1/4″ thickness required). All swage marks are completely hidden from view! Use HAND SWAGING for this assembly type. 11 assemblies needed for each cable run 36″ high. 13 assemblies needed for each cable run 42″ high. TIP: It’s more economical to have longer cable runs that run continuously around corners so fewer fittings are needed. Minimum metal post requirements: STEEL PIPE 2″x 2″x 1/4″ or 1 1/2″ ID or 1 1/8″ OD ANGLE IRON or WELDED TAB 2″x 2″x 1/2″ FLAT BAR 2″ wide and 1″ thick Parts and services needed to complete this cable assembly: SWAGE STUD WITH 1×19 CABLE for straight runs and runs with slight bends or SWAGE STUD WITH 7×7 CABLE for runs that have 90 degree corners. A SWAGE STUD is “fixed” at one end of the cable by pre-swaging (no charge) at the factory and is not to be swaged by hand in the field. 1 FineLine™ DRILL & TAP TURNBUCKLE Note: For all Assembly lengths >50′ (70′ max) and/or runs from 0-70′ with more than 1 90 degree corner, it is recommended to omit the SWAGE STUD WITH CABLE and use 2 FineLine™ DRILL & TAP TURNBUCKLES instead to allow cable tightening at both ends of your run. In this situation, substitute the SWAGE STUD WITH CABLE with STAINLESS CABLE CABLE CUTTER CABLE CRIMPER tools to hand swage your wire rope assemblies. Note: Stainless Steel is highly resistant, but not impervious to the elements, and requires minimal maintenance for ideal results. We recommend applying Passivator to all exposed stainless steel components at the time of installation. In addition, apply Rust Rescue if within 10 miles of a marine environment to further protect the stainless steel. Learn more about these products and general stainless steel care on our Cleaning & Maintenance Page. Need help designing your railing project or an estimate? Email drawings(non-technical OK) to us at: [email protected] and we will respond within 24 hours. See the WORKSHEETS tab for additional resources or just phone/fax us at 1-888-686-7245 (RAIL). We are happy to help! Product # 724606, 982604, 715901, 716144, 715918, 716151, 715925, 716168, 715932, 716175, 715949, 716182, 715864, 715857, 715956, 716199, 715963, 716205, 715970, 716212, 715987, 716229, 715994, 716236, 716007, 716243, 716014, 716250, 716021, 716267, 716038, 716274, 716045, 716281, 715871, 716113, 716052, 716298, 716069, 716304, 716076, 716311, 716083, 716328, 716090, 716335, 716106, 716342, 715888, 716120, 715895, & 716137
Cable Railing Fittings | Metal Post

Cable Railing Fittings | Metal Post

  • #12 x 1.25″ Phillips Pan Head Screw
    $15.56 $26.14
  • FINELINE™ JAW/EYE ASSEMBLY for Cable Deck Railing Systems
    $34.7 $59.34
  • Classic Jaw Assembly – For 3/16″ Cable
    $65 $104.65
  • #8 X 1 1/4″ PHILLIP FLAT HEAD SCREW
    $30.22 $53.49
  • FineLine™ Drill & Tap Assembly – For 3/16″ Cable
    $16.62 $27.42
  • Surface Mount Toggle Assembly – Black Oxide Stainless
    $21.06 $28.22
  • #8 X 3/4″ PHILLIP FLAT HEAD SCREW FOR CABLE RAILING SYSTEMS
    $32.42 $60.3
  • SURFACE MOUNT TOGGLE ASSEMBLY
    $10.53 $15.8
  • FineLine™ Jaw / Metal Assembly
    $22.01 $35.88

© 2026 - GRUWI-IT.DE